The works kept its steel smelting at the January 2013
level (82 thousand tons) and increased pig iron output by 4.9%, to 79 thousand
tons.
In December 2013 the company produced 65 thousand tons
of pig iron, 67 thousand tons of steel and 71 thousand tons of rolled metal.
In January 2014 the works
planned to produce 73 thousand tons of steel and 71 thousand tons of pig iron. (Ukrainian
metal)