1/6/17

Ukraine: AMKR launches engineering and geological research at the site of LF-CC 2

ArcelorMittal Kriviy Rih launched geological engineering survey at the construction site of future LF-CC No. 2. On January 3, R&D Institute Mekhanobrchermet commenced the works; the first wells have been drilled at construction site

Здесь можно оставить свои комментарии. Выпуск подготовленплагином wordpress для subscribe.ru